The first passenger trains run from West Side to Lake Mead

West Side Transportation Co. plans to expand its West Side Transit Line and its Lake Mead Transit Center by adding another passenger train in 2018.

The new line, which is expected to be a half-mile longer than the existing line, will run from downtown West Side’s west end to Lake Powell.

The line will include a shuttle service between West Side and Lake Mead, and it will connect the two terminals.

West Side’s first new passenger train service will run to Lake View, and a second will connect Lake View to downtown West.

Both lines are expected to connect to the West Side Ferry and the Lake Mead and West Side Baylight lines.

The lines will connect to Interstate 20 in West Lake and Lake View and Lake Powell in Lake View.

The West Side Transformer is expected be complete by the end of 2019.